Every project below names the architect, the developer, the volume we shipped, and the measurable outcome. No glossy stock photos dressed up as our work.

Nirvana Heights, Nagpur
Residential Completed

Project · 2025

01 / 06

Nirvana Heights

Wardha Road, Nagpur

A 14-floor luxury residential tower with 72 units, the developer's first project switching from red-brick walling to VAJRA AAC. The structural engineer needed lighter walls to reduce dead load on the raft foundation; the architect needed thermal comfort without increasing wall thickness.

Outcome

Brickwork phase finished 18 days ahead of schedule with two fewer masons per floor. Steel quantity dropped 7% versus the original red-brick design. Interior temperature measured 4.6°C cooler than a comparable adjacent tower during the Nagpur summer.

14
Floors
1.1L sq ft
Saleable area
18 days
Schedule saved
31%
Dead load reduction
Client

Khurana Developers

Architect

Studio Sutra, Pune

Volume

1,420 m³

Timeline

14 months

Sizes used:6″ (150 mm)8″ (200 mm)
Khurana Square Indore
Commercial Completed

Project · 2025

02 / 06

Khurana Square

AB Road, Indore

Grade-A commercial office of 1.4L sq ft over six floors with full-height curtain glazing. Acoustic separation between tenants and a low U-value envelope were both critical for IGBC Gold compliance.

Outcome

IGBC Gold awarded on first review — wall envelope contributed 7 credits. STC-48 measured between tenant suites. HVAC load designed at 0.85 TR per 100 sq ft (vs. 1.1 TR industry baseline for Indore climate).

1.4L sq ft
Built-up
Gold
IGBC
23%
HVAC saving
48
STC rating
Client

Khurana Developers

Architect

Morphogenesis, Delhi

Volume

980 m³

Timeline

11 months

Sizes used:6″ (150 mm)8″ (200 mm)
Mahindra warehouse exterior
Industrial Completed

Project · 2024

03 / 06

Mahindra Logistics Hub

Hingna MIDC, Nagpur

A 60,000 sq ft regional dispatch warehouse needing rapid masonry to hit a fixed cut-over date. The lower 3 metres of all four walls in AAC for impact resistance and the upper structure in PEB cladding.

Outcome

Walling phase completed in 38 working days versus a 60-day projection. Boundary fire rating of 4 hours satisfied the local fire marshal in a single inspection.

60K sq ft
Built-up
4 hr
Fire rating
22
Days saved
510
Pallets delivered
Client

Mahindra Logistics Ltd.

Architect

In-house PEB team

Volume

640 m³

Timeline

5 months

Sizes used:6″ (150 mm)9″ (225 mm)
Trillium Villas cluster
Residential Completed

Project · 2024

04 / 06

Trillium Villas

Baner, Pune

A gated cluster of 12 contemporary villas, each ~3,200 sq ft. The architect specified 6-inch external walls and 4-inch internal partitions to keep the wall footprint thin and maximise carpet area.

Outcome

Average 4.1% gain in carpet area versus a conventional 9-inch brick layout. Owners reporting peak summer interior temperatures of 28–29°C with single split-AC units sized at 1.5 TR per bedroom.

12
Villas
4.1%
Carpet gain
Thin-bed
Wall thickness
−18%
AC load
Client

Trillium Realty

Architect

Sanjay Puri Architects

Volume

540 m³

Timeline

9 months

Sizes used:4″ (100 mm)6″ (150 mm)
Care Hospital wing
Institutional Ongoing

Project · 2026

05 / 06

Care Hospital — South Wing

Raipur, Chhattisgarh

A 240-bed new wing of a tertiary care hospital with strict requirements on infection control (smooth seamless walls), acoustic isolation between wards, and 2-hour fire compartmentation between operating theatres.

Outcome

Wall envelope on track to deliver STC-52 between ICU pods. Smooth thin-bed finish is reducing the paint-prep cycle by an estimated 40% versus the brick-and-plaster baseline of the existing wing.

240
Beds
STC-52
Wards
2 hr
Fire compartment
40%
Paint cycle saved
Client

Care Hospitals

Architect

HOSMAC, Mumbai

Volume

1,180 m³ (in progress)

Timeline

16 months projected

Sizes used:6″ (150 mm)8″ (200 mm)
Centaur Suites Bhopal
Hospitality Completed

Project · 2025

06 / 06

Centaur Suites

MP Nagar, Bhopal

A 64-key boutique business hotel with restaurant, conferencing and rooftop bar. The brief was to deliver a quiet guest experience in a busy commercial precinct — every guestroom partition needed STC-50 minimum.

Outcome

Independent acoustic test post-handover measured STC-51 across 18 sampled room-pair walls. Hotel opened to a 4.7-star Google rating in its first quarter; guests specifically calling out the silence.

64
Keys
STC-51
Acoustic test
4.7★
Opening review
On time
Schedule
Client

Centaur Hospitality

Architect

RSP Design Consultants

Volume

420 m³

Timeline

8 months

Sizes used:6″ (150 mm)

5,180+

m³ shipped to date

42

Projects served

11

Cities reached

100%

On-spec deliveries

Your project could be the next case study.

Share the brief — drawings, location, timeline — and our technical team will come back with a quote and a wall-build advisory within 24 hours.