VVAJRAConcrete · Nagpur
Sustainability

The wall is half
of the building's
carbon story.

An AAC wall is built from waste, cured with low energy, and insulates for 60 years. Every cubic metre ships with full traceability — fly-ash source, batch chemistry, embodied carbon — so you can put a number on your project's envelope.

Modern green building with living wall and solar panels
0 kg

CO₂ saved per m³

vs red brick

0%

Industrial waste reused

fly ash from Koradi TPS

0%

Less water in production

vs traditional clay brick

0

Topsoil destroyed

no clay mining, ever

The math

180 kg of CO₂ saved per cubic metre. Where it comes from.

Calculated under EN 15804 in our Environmental Product Declaration, using actual logistics distances and our 2025 grid electricity mix. The numbers are independently verified by a third-party assessor.

Red brick walling, 1 m³

360 kg CO₂

VAJRA AAC walling, 1 m³

180 kg CO₂

Fly-ash cement block, 1 m³

245 kg CO₂

At project scale

A typical 1,500 sq ft villa uses ~90 m³ of walling. Switching to VAJRA AAC saves 16.2 tonnes of CO₂— roughly a full year of an Indian household's carbon footprint.

The full lifecycle

From coal-plant waste to recyclable aggregate.

01

Source: industrial by-product

70% of our raw material is fly ash diverted from Koradi Thermal Power Station's waste stream. Material that would otherwise go to ash pond.

02

Manufacture: 1/3 the embodied energy

Autoclave curing at 190°C uses far less energy than red-brick kiln firing at 900°C. Steam captured and reused across batches.

03

Use: lighter HVAC for 60+ years

Low thermal conductivity (0.21 W/m·K) cuts air-conditioning energy by 18–25% for the building's entire operational life.

04

End of life: fully recyclable

Demolished AAC is inert and 100% recyclable as aggregate for road sub-base or new concrete. No hazardous waste classification.

Green building credits

Up to 18 credits across LEED & IGBC.

Every credit category VAJRA AAC walling contributes to in a typical IGBC Green Building submission. Useful for the green consultant on your project.

MR Credit 1.1

Building Reuse / Material Reuse

Indirect — AAC enables longer building lifecycle.

MR Credit 4

Recycled Content

VAJRA contains 65% post-industrial recycled content (fly ash).

MR Credit 5

Regional Materials

Manufactured in Nagpur — within 500 km of most central-India sites.

EA Credit 1

Optimize Energy Performance

Low U-value envelope reduces HVAC load by up to 23%.

IEQ Credit 4.1

Low-Emitting Materials

Zero VOC, mineral-only composition.

IN Credit 1

Innovation in Design

Thin-bed adhesive system qualifies for innovation point.

Green-building consultant on your project?

We'll send the full IGBC credit submission template, pre-filled with VAJRA data.

Request template

By 2030: net-zero plant operations.

We're installing 1.2 MW of rooftop solar in 2026, switching all autoclave boilers to bio-mass briquette feedstock by 2028, and targeting net-zero scope-1 and scope-2 emissions for the Hingna plant by financial year 2030. Annual progress reports are published publicly.

Read our roadmap